Appendix F – Link Install and Commissioning Logs
Standardized forms are provided here for use during the installation and configuration
phase and to serve as a record of the link performance at the time of installation. It is
highly recommended that the operator use the status save feature in the radio to save
the state of the link upon commissioning.
242
Trango Systems, Inc.
GigaPlus User Manual Rev 3.1
Need help?
Do you have a question about the TrangoLINK GigaPlus and is the answer not in the manual?