Figure 12-9 P - Radwin WinLink 1000 User Manual

Broadband wireless
Hide thumbs Also See for WinLink 1000:
Table of Contents

Advertisement

Switching from Primary Link to Secondary Link
Loss of the primary air interface due to failure of the receiver to acquire expected E1/
T1 data during a period of 24ms
The Primary equipment (either ODU or IDU, local or remote) is powered off
Following the switch from the primary to the secondary link, the primary and secondary link
Manager main windows should look like this:
Figure 12-9: Primary link after the switch over to secondary link (After a few seconds the dis-
play moves to No-Link display, with TDM ports grayed out.)
WinLink 1000 User Manual
Release 1.9.40
Chapter 12
12-11

Advertisement

Table of Contents
loading

Table of Contents