Download Print this page

Section One: Vs C15 Calibrated Leak Replacement - Agilent Technologies VS C15 Series Field Replacement Instructions

Calibrated leak replacement for leak detectors

Advertisement

Section One: VS C15 Calibrated Leak Replacement

Equipment Required
• M4 Allen Wrench
• Flat Head Screwdriver
Installation Procedure
WARNING
Disconnect power from the unit before performing any maintenance procedure that
requires physically disconnecting any part of the system.
1. Disconnect the power to back of the unit and unplug.
2. Wait 30 seconds for the high voltage to dissipate.
3. Using an M4 Allen wrench, remove the two screws on the unit's top and open the unit (Figure 1: Unit Top Screws).
Figure 1: Unit Top Screws
Calibrated Leak Replacement for VS C15, VS, and (G8610, G8611, or G8612) Series Leak Detectors
Page 3 of 12
Document No.
Revision
699909998
C

Advertisement

loading

This manual is also suitable for:

Vs seriesG8610 seriesG8611 seriesG8612 series