– In order to satisfy cooling requirements, populate memory channels on
alternating sides of the CPU:
Order
1
2
3
4
10.2
Installing memory modules
Upgrade and Repair Unit
(URU)
Tools: tool-less
10.2.1 Preliminary steps
"Suspending BitLocker functionality" on page 111
Ê
"Disabling SVOM boot watchdog functionality" on page 112
Ê
"Shutting down the server" on page 58
Ê
"Disconnecting the power cord" on page 59
Ê
"Getting access to the component" on page 61
Ê
"Removing the system air duct" on page 91
Ê
TX2560 M2 / RX2560 M2
CPU 1
Channel A
Channel C
Channel B
Channel D
Upgrade and Maintenance Manual
Main memory
CPU 2
Channel E
Channel G
Channel F
Channel H
Hardware: 5 minutes
359