Completing Pre-Upgrade Tasks - If The Target S8300 Is The Primary Controller - Avaya G700 Installing And Upgrading

Hide thumbs Also See for G700:
Table of Contents

Advertisement

Completing pre-upgrade tasks — If the target S8300 is the primary
controller
If the S8300 is configured as an LSP, skip to
controller, LSPs, and G700 media gateways
!
CAUTION:
If you are upgrading an S8300 primary controller that has LSPs registered to it,
CAUTION:
the LSPs must be upgraded before the primary controller. (You can use the SAT
command, list media-gateway, to see if there are LSPs registered to the
S8300.)
Perform the following procedures if you are upgrading an S8300 that is configured as a primary
controller:
To clear alarms
To check link status
To record all busyouts
To disable scheduled maintenance
To check for translation corruption
To save translations
To disable alarm origination
Note:
It is no longer necessary to disable Terminal Translation Initialization (TTI) before
Note:
an upgrade or to enable it after an upgrade.
On-site Preparation for the Upgrade
Run the Upgrade Tool to upgrade the primary
on page 281.
Issue 10.2 May 2007
261

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8300

Table of Contents