Triumph 2012 Tiger 800 Service Manual page 331

Table of Contents

Advertisement

12.
Insert the link plate holder (marked PH5060R> into
the large pressure screw.
1. Tool body
2. Large pressure screw
3. Link plate holder <marked PH 5060R>
4. Riveting tail piece
1 3 .
Position the tool to the chain. Ensure the l i n k plate
holder is correctly located in the large pressure
screw.
1. T ool body
2. Large pressure lever
3. Link plate holder <marked PH 5060R>
4. Riveting tail piece
2
2
Setvice Manual
Tiger 800 and Tiger 800XC
-
14.
Locate the split link pins such that the pins will enter
the groove in the link plate holder when the link
plate is pressed on to the link.
2
1. Link plate holder
2. Link plate
3. Chain link
4. Lin k plate holder groove
1 5 .
Retain the tool body a n d tighten the large pressure
screw until the link plate is pressed fu lly onto the link.
16.
Back off the pressure screw, slide the tool assembly
to one side and check that the split link is correctly
assembled.
1 Z
Remove the link plate holder from the tool. D o not
remove the riveting tail piece from the tool
18.
I nsert the flare pin into the large pressure screw.
cdqn
1. Tool body
2. Large pressure screw
3. Riveting tail piece
4. Rair pin
19.
Locate one of the split link pins into the riveting tail
piece ,and screw the large pressure screw in until the
flare pin contacts the split link end. Ensure the split
link pin is centrally located on the flare pin.
Rear Suspension
1
2
12. 17

Advertisement

Table of Contents
loading

Table of Contents