Panasonic DBS 824 Installation Manual page 39

Digital business system
Hide thumbs Also See for DBS 824:
Table of Contents

Advertisement

Analog Extensions
Trunks and Lines
Table 4-3.
Maximum distances for SLTA insfallation
I
Wiring
Max. distance (in feet) between
Max. distance (in feet
)
gauge
the DBS 824 and SLTA
between the SLTA and the SLT
IAwG~~
I
300' or 10 R
3000' or 100 n
1
I
AWG 24
190' or 10 n
1900' or 100R
AWG 26
120' or 10 R
1200' or 100 R
1
4. If the DBS 824 is powered up, turn off the power.
5.
Connect the GND and +24V leads on the SLTA to the DBS 824 power
supply. Be sure the wires do not touch each other or touch the metal
frame housing.
6. If desired, turn on the DBS 824 power.
7. Connect the "T" and "R" leads to the digital extension ports on the DBS
824 as per Figure 4-7. One digital extension port is required for each SLT.
8. Connect the SLT "T" and "R" leads to the SLTs.
9.
Install the cover on the SLTA.
4-12
DBS 824-10-300
Issued 3/l/95