Co Delayed Day Ring Assignments For Hunt Groups - Panasonic DBS 824 Installation Manual

Digital business system
Hide thumbs Also See for DBS 824:
Table of Contents

Advertisement

FF4
CO Delayed Day Ring Assignments for Hunt Groups
CO Delayed Day Ring Assignments
for Hunt Groups
Software Version: CPC-S and CPC-M, Version 1 .O and higher
Address:
FF4 5## (HuntGrp)# (Trunk)# (0 or l)#
Description
This program assigns delayed ringing to hunt groups for unanswered calls on
specific trunks during the "Day" mode. Delayed ringing works like an
automatic transfer -- if an incoming trunk call is unanswered at one extension
after a certain period of time, the system will send the call to ring at another
extension (the first extension will stop ringing).
The original extension or hunt group that receives an incoming trunk call
during "Day" mode is set in the CO Day Ring Assignments address (FF4 1#
ExtPort/HuntGrp## Trunks). The period of time that passes before the system
transfers the unanswered call, is set in the CO Delayed Ring Timer address
(FFl 3# 22#).
Programming
FF4 5## (23-26
or
3%34)# (1-6
or
I-8)#
(0
or
l)#
/
f
t
Hunt Groups 1 thru 4:
Trunk Number
O=Do not ring this hunt
CPC-SC1PC-M
CPC-S: l-6
group if the trunk call is
23
31
7'
CPC-M: l-8
unanswered elsewhere.
24
32
2
the
25
33
7
l=Ring this hunt group if
trunk call is unanswered
26
34
.
4
elsewhere.
Related Programming
Delayed Ring: FFl 2# l# 21# (0 or l)#
CO Delayed Ring Timer: FFl 3# 22# (0-15)#
Automatic Day Mode Start Time: FFl 3# 25# HHMM#
CO Day Ring Assignments for Hunt Groups: FF4 l# (HuntGrp)## (Trunk)#
(0 or l)#
Issued 3/l /95
DBS 824-l O-400
4-15

Advertisement

Table of Contents
loading

Table of Contents