FIPS
46. Activate the crypto-lists on all cipher-text interfaces. For flows that need to be encrypted
even if directed to clear-text interfaces, apply crypto lists to all interfaces.
Use the ip crypto-group command in the interface context
G350-N(super)# interface FastEthernet 10/2
G350-N(if:fastEthernet 10/2)# ip crypto-group 901
Done!
G350-N(if:fastEthernet 10/2)# exit
G350-N(super)# interface serial 2/1:1
G350-N(if:serial 2/1:1)# ip crypto-group 902
Done!
G350-N(if:serial 2/1:1)# exit
47. Save the running configuration to the startup configuration.
- Use the copy running-config startup-config command.
G350-N(super)# copy running-config startup-config
Beginning copy operation ..................... Done!
48. Physically re-connect the network interfaces.
Failure scenarios and repair actions
The G250/G350 initiates power up tests automatically, without the need for operator
intervention, and executes tests in the order defined below.
The power-up self-tests are executed during the early boot sequence and before the G350's
data output interfaces are enabled and begin transmitting packets.
The power-up self-test order is:
1. Booter Integrity Self test
2. Image Integrity Self test
3. NVRAM Self test
4. PRNG Self-test
5. Crypto Self-tests
6. EEPROM Self-test
The power-up self test progress is output to the gateway console port.
528 Administration for the Avaya G250 and Avaya G350 Media Gateways