Agilent Technologies HP 8719D Service Manual page 430

Network analyzers
Table of Contents

Advertisement

Assemblies
n
n
n
ESD (electrostatic discharge) grounding wrist strap
n
n
Removal
1. Remove the bottom cover (refer to "Covers" in this chapter).
2. Remove the front panel (refer to "Front Panel Assembly" in this chapter).
3. Reaching the connections from the bottom of the analyzer, disconnect the
four RF cables attached to the couplers: two from the back of the couplers
and two from between the couplers.
4. Remove the six screws (item 1) from the bottom edge of the front panel
frame.
5. Remove one screw (item 2) from the right side of the coupler bracket.
6. Remove the coupler nuts (item 3).
LED Board Removal
7. Remove the three screws (item 4) that attach the LED board to the coupler
bracket.
Replacement
1. Reverse the order of the removal procedure.
Note
When reconnecting semi-rigid cables, it is recommended that the
connections be torqued to 72 in-lb.
14-34 Assembly Replacement and Post-Repair Procedures

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hp 8720dHp 8722d

Table of Contents