1. Remove the power line cord from the analyzer.
2.
Set the analyzer on its side.
3. Remove the two corner standoffs from the bottom of the instrument with the
4.
Loosen the captive screw on the bottom cover's back edge, with the T-15
5. Slide the cover toward the rear of the instrument.
Proper ESD procedures must be used when performing the
following step.
6. Move the jumper or switch as shown in F'igure 3-l or F'igure 3-2.
Move the A7 jumper/switch to the Alter position (AU') before you nm any
n
of the correction constant adjustment routines. This is the position for
Move the A7 jumper/switch to the Normal position (NRM) after you have
n
run correction constant adjustment routines This is the position for normal
operating conditions
7.
Reconnect the power line cord and switch on the instrument.
and Correction Constants