Boot Completed - Siemens SINUMERIK MC Commissioning Manual

Mcu commissioning: nc, plc, drive
Hide thumbs Also See for SINUMERIK MC:
Table of Contents

Advertisement

Restoring the factory settings puts the PLC into a defined initial state:
● The PLC data have been deleted from the SD card.
● The retentive data are initialized.
● The IP address assigned via TIA Portal has been cleared.
3.4.3

Boot completed

Run-up completed without error
After an error-free run-up of the MCU, the following status is displayed:
● The number 6 and a flashing point.
● RUN LED is continuously lit green.
Next steps:
● Check the NC and IPC connection of the MCU.
● Commission the PLC using the TIA Portal.
MCU commissioning: NC, PLC, Drive
Commissioning Manual, 02/2020, A5E47437618B AB
Requirements for commissioning
3.4 Power-On and boot-up
31

Advertisement

Table of Contents
loading

Table of Contents