Remove Chain Sub-Assembly/Idle Sprocket Assembly - Toyota 2GR-FE Manual

Table of Contents

Advertisement

Center Line
10°
Timing Mark
RH Bank:
2GR-FE ENGINE MECHANICAL – ENGINE UNIT
30. REMOVE CHAIN SUB-ASSEMBLY
(a) Turn the crankshaft counterclockwise 10° to loosen
(b) Remove the pulley set bolt.
Sensor Plate
A134897E01
(c) Remove the chain from the crankshaft timing
A134890
(d) Turn the camshaft timing gear assembly on the RH
(e) Remove the chain.
A095682E03
31. REMOVE IDLE SPROCKET ASSEMBLY
(a) Using a 10 mm hexagon wrench, remove the No. 2
A129695
32. REMOVE NO. 1 CHAIN VIBRATION DAMPER
(a) Remove the 2 bolts and vibration damper.
33. REMOVE NO. 2 CHAIN VIBRATION DAMPER
(a) Remove the 2 vibration dampers.
A129696
the chain of the crankshaft timing sprocket.
sprocket and place it on the crankshaft.
bank clockwise (approximately 60°) and set it as
shown in the illustration. Be sure to loosen the chain
between the banks.
idle gear shaft, sprocket and No. 1 idle gear shaft.
EM–75
EM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents