Toyota 2GR-FE Manual page 732

Table of Contents

Advertisement

(g)
(f)
(f)
(i)
(j)
(h)
(j)
2GR-FE FUEL – FUEL INJECTOR
(d) Connect the connector.
A129467
(e) Install the vacuum hose clamp with the bolt.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
A129466
(f)
Connect the union to check valve hose.
(g) Connect the No. 1 ventilation hose.
A129465E06
(h) Install the clamp and connect the throttle with motor
body assembly connector.
(i)
Connect the vapor feed hose.
(j)
Connect the 2 water by-pass hoses to the throttle
(h)
with motor body assembly.
4.
INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See
page ES-506)
5.
ADD ENGINE COOLANT (See page CO-6)
A129464E02
6.
CONNECT CABLE TO NEGATIVE BATTERY
TERMINAL
7.
CHECK FOR ENGINE COOLANT LEAKS (See page
CO-1)
8.
CHECK FOR FUEL LEAKS (See page FU-8)
9.
INSTALL COWL TOP PANEL OUTER SUB-
ASSEMBLY (See page ES-485)
10. INSTALL WINDSHIELD WIPER MOTOR AND LINK
ASSEMBLY (See page WW-14)
FU–19
FU

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents