Promise Technology 1000f series Product Manual page 152

Fc, iscsi, sas external disk array subsystems
Hide thumbs Also See for 1000f series:
Table of Contents

Advertisement

VessRAID 1000f, 1000i, 1000s Product Manual
To power off the subsystem:
1.
Click the Subsystem
2.
Click the Administrative Tools
3.
Click the Shutdown link in Management View.
A Shutdown or Restart tab appears.
4.
Choose Poweroff from the dropdown menu and click the Submit button.
5.
In the confirmation box, type the word confirm in the field provided.
6.
Click the OK button.
When the controller shuts down, your WebPAM PROe connection is lost.
7.
Wait for no less than two minutes.
Monitoring the Power Off
To monitor a power-off, you must use the Command Line Interface (CLI) though a
serial connection to the VessRAID.
When you see the message: "Shutdown complete. It is now safe to power off the
subsystem" the subsystem is ready to power on. See "Powering On a NAS
Device" on page 187.
If you have a JBOD expansion, always power off the RAID
subsystem first. Then power off the JBOD expansion units.
icon in Tree View.
After you power off the subsystem, wait at least 10 seconds before
you power on the subsystem again.
Important
icon.
Caution
132

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000i series1000s series

Table of Contents