Viewing Scheduled Activities; Scheduling An Activity - Promise Technology 1000f series Product Manual

Fc, iscsi, sas external disk array subsystems
Hide thumbs Also See for 1000f series:
Table of Contents

Advertisement

VessRAID 1000f, 1000i, 1000s Product Manual

Viewing Scheduled Activities

To view scheduled activities for this subsystem:
1.
Click the Subsystem
2.
Click the Scheduler tab in Management View.

Scheduling an Activity

To set a scheduled activity for this subsystem:
1.
Click the Subsystem
2.
From the dropdown menu on the Scheduler tab, choose an item:
Media Patrol. See "Running Media Patrol" on page 73
Redundancy Check. See "Running Redundancy Check" on page 170
Battery Reconditioning. See "Reconditioning a Battery" on page 143
Spare Drive Check. See "Running Spare Check" on page 178
LUN Clone. See "Creating a LUN Clone" on page 173
Power on
Power off
3.
In the Scheduler dialog box, check the Enable This Schedule box.
4.
Select a start time (24-hour clock).
5.
Select a Recurrence Pattern.
Daily – Enter the number of days between events.
Weekly – Enter the number of weeks between events and choose
which days of the week.
Monthly – Choose a calendar day of the month (1 – 31).
If you choose a higher number than there are days in the current month, the
actual start date will occur at the beginning of the following month.
Or, choose a day of the week and choose the first, second, third, fourth, or
last occurrence of that day in the month.
Then, choose the months in which you want the activity to occur.
6.
Select a Range of Occurrence.
Start-from date. The default is today's date.
End-on date.
Select No End Date (perpetual).
Or, choose a number of occurrences for this activity.
Or, choose a specific end date. The default is today's date.
7.
For Redundancy Check only:
icon Tree View.
icon Tree View.
74

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000i series1000s series

Table of Contents