Nas Management; Restarting The Subsystem; Powering Off The Subsystem - Promise Technology 1000f series Product Manual

Fc, iscsi, sas external disk array subsystems
Hide thumbs Also See for 1000f series:
Table of Contents

Advertisement

NAS Management

This category includes the following topics:
Restarting the Subsystem (page 203)
Powering Off the Subsystem (page 203)
IShutting Down the Subsystem (page 204)

Restarting the Subsystem

To restart the subsystem:
1.
Click the NAS Management icon at the top of the screen.
The Shutdown icon at the bottom of the screen is automatically selected.
2.
Click the Restart option button.
3.
Click the OK button.
When the controller restarts, your SmartNAVI connection is interrupted.
4.
Monitor the subsystem in the Device List.
When the subsystem icon changes from gray
subsystem to display it in SmartNAVI.

Powering Off the Subsystem

This option enables you to power on the NAS from SmartNAVI.
The Wake on LAN option must be enabled.
See "Making Management Port Settings" on page 83 or page 248.
The NAS must be in a powered off state.
203
Chapter 5: SmartNAVI
to blue
, click the

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000i series1000s series

Table of Contents