5
4
2
Workshop Manual Ed.09-2012
GENERAL ENGINE PROCEDURES
TR 650 TERRA 2013 - TR 650 STRADA 2013
REMOVAL/INSTALLATION OR REPLACEMENT OF THE TIMING CHAIN
-
Remove the head cover and the camshafts as described in the relevant
paragraphs.
-
Fix the timing chain with metal wire so that it does not slip into the engine.
-
Remove the left cover as described in the relevant paragraph.
-
Unscrew the nut (1) and remove the spring washer (2).
-
Press the chain tensioner towards the rear of the engine (3).
-
Remove the dual gearbox (4) from the shaft and remove the timing chain (5).
-
Check the chain tensioner slide (3) for wear, replace if worn by undoing screw
(6).
3
-
Insert the timing chain (5) into the recess and position it around the crankshaft,
6
push towards the chain tensioner slider (3) rear of the engine.
-
Mount the dual gearbox (4) onto the crankshaft.
-
Fit the chain (5) onto the dual gearbox (4).
-
Fit the split washer (2).
1
-
Clean the threads of crankshaft and hex nut (1).
-
Tighten the nut (1) to torque with Loctite 243.
- Refit all the previously removed components as described in the relevant
H11568
paragraph and perform phasing operations.
F1.20