Crank Balancer Disassembly And Assembly - Suzuki GSF1250 Service Manual

Hide thumbs Also See for GSF1250:
Table of Contents

Advertisement

1D-72 Engine Mechanical:
• Install the spacer (7).
"C"
Clutch
• Install the clutch component parts (1). Refer to "Clutch
Installation in Section 5C (Page 5C-14)".
1
Starter Motor
• Install the starter motor (1). Refer to "Starter Motor
Removal and Installation in Section 1I (Page 1I-4)".
1
Engine Top Side
• Assemble the engine top side. Refer to "Engine Top
Side Assembly (Page 1D-28)".
7
I718H1140255-01
Water Hose
• Connect the water hoses. Refer to "Water Hose
Routing Diagram in Section 1F (Page 1F-3)".
I718H1140256-01

Crank Balancer Disassembly and Assembly

Refer to"Engine Bottom Side Disassembly (Page 1D-
53)".
Refer to "Engine Bottom Side Assembly (Page 1D-61)".
NOTE
It is unnecessary to remove the engine
assembly from the frame when removing the
crank balancer.
I718H1140257-01
I718H1140258-01
I718H1140259-01
B718H11406032

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsf1250aGsf1250sGsf1250sa

Table of Contents