Suzuki GSF1250 Service Manual page 218

Hide thumbs Also See for GSF1250:
Table of Contents

Advertisement

1D-16 Engine Mechanical:
3) Connect the respective vacuum tester hoses to each
vacuum nipple on the throttle body.
4) Start the engine.
5) Set up the SDS tool. (Refer to the SDS operation
manual for further details.)
6) Click "Data monitor".
7) Warm up the engine (Water temp. more than 80°
(176 °F)).
10) Click "ON" button (3) to fix the ISC air volume of four cylinders.
NOTE
When making this synchronization, be sure that the water temperature is within 80 – 100 °C (176 – 212
°F).
I718H1140389-01
"A": Engine speed: Approx. 1 200 rpm
8) Click "Active control".
9) Click "ISC air volume control" (2).
"A"
"B"
"B": ISC valve position: Approx. 77 step
I718H1140382-01
2
I718H1140384-01
3
I718H1140385-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsf1250aGsf1250sGsf1250sa

Table of Contents