1I-4 Starting System:
Starter Motor Removal and Installation
Removal
1) Turn the ignition switch OFF and disconnect the
battery (–) lead wire. Refer to "Battery Removal and
Installation in Section 1J (Page 1J-12)".
2) Remove the throttle body. Refer to "Throttle Body
Removal and Installation in Section 1D (Page 1D-
9)".
3) Remove the engine sprocket outer cover (1).
4) Remove the regulator/rectifier bracket mounting
bolts.
5) Remove the starter motor mounting bolts.
6) Disconnect the starter motor lead wire (2) and ECT
B718H11906002
sensor coupler (3).
7) Remove the starter motor (4).
1
Installation
Install the starter motor in the reverse order of removal.
Pay attention to the following points:
• Apply grease to the starter motor O-ring.
GREASE A or equivalent)
I718H1190002-01
Replace the O-ring with a new one.
I718H1190003-01
• Connect the starter motor lead wire.
Tightening torque
Starter motor lead wire mounting nut (a): 5 N·m (
0.5 kgf-m, 3.5 lb-ft)
I718H1190004-01
2
4
: Grease 99000–25010 (SUZUKI SUPER
CAUTION
!
(a)
3
I718H1190005-02
I718H1190006-01
I718H1190007-01