Suzuki GSF1250 Service Manual page 155

Hide thumbs Also See for GSF1250:
Table of Contents

Advertisement

Step
1
1) Turn the ignition switch OFF.
2) Remove the left frame cover. Refer to "Exterior Parts
Removal and Installation in Section 9D (Page 9D-6)".
3) Check the GP switch coupler for loose or poor contacts.
If OK, then measure the GP switch voltage.
4) Support the motorcycle with a jack.
5) Fold the side-stand to up position.
6) Make sure the engine stop switch is in the "RUN"
position.
7) Insert the needle pointed probe to the lead wire coupler.
8) Turn the ignition switch ON.
9) Measure the voltage at the wire side coupler between
the P and B/W wire, when shifting the gearshift lever
from 1st to Top.
Special tool
(A): 09900–25008 (Multi-circuit tester set)
(B): 09900–25009 (Needle pointed probe set)
Tester knob indication
Voltage (
)
GP switch voltage
0.6 V and more
((+) terminal: P – (–) terminal: B/W)
Is the voltage OK?
Action
I718H1110254-01
(A)
(B)
(B)
I718H1110203-03
Engine General Information and Diagnosis:
Yes
• P wire open or
shorted to the
ground.
• If wire and
connection are OK,
intermittent trouble or
faulty ECM.
• Recheck each
terminal and wire
harness for open
circuit and poor
connection.
• Replace the ECM
with a known good
one, and inspect it
again. Refer to "ECM
Removal and
Installation in Section
1C (Page 1C-1)".
1A-86
No
• P or B/W wire open,
or P wire shorted to
the ground.
• Loose or poor
contacts on the ECM
coupler.
• If wire and
connection are OK,
replace the GP
switch with a new
one. Refer to "Gear
Position (GP) Switch
Removal and
Installation in Section
5B (Page 5B-12)".

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsf1250aGsf1250sGsf1250sa

Table of Contents