Overland Storage NEO 200S User Manual page 37

Network storage
Hide thumbs Also See for NEO 200S:
Table of Contents

Advertisement

NEO 200s/400s User Guide
2. Ensuring that the flange on each rail points toward each other to form a shelf, secure
one rail to each side of the rack in your chosen rack location:
NOTE: Use the screws for your rack type (labeled for round holes or square holes) and a #2
a. Extend the rails to fit your particular rack depth.
b. With the large black screws, secure the front and back of each rail to the rack.
NOTE: The rails must be fastened with the bottom of the each rail parallel to floor and at the
Attach the Rail Brackets
1. Using the Torx wrench included in your shipment, remove the two screws ( ) noted
from both sides of the library.
Screw locations on the 4U library are similar.
10400367-001 04/2012
&
Two EIA units (2U)
needed for round
hole and square
hole rail
installation
Phillips screwdriver to install the rails.
The two alignment pins go into the first and second holes from the bottom of the
2U space. The extension sections should be at the rear.
The screw securing the rack goes into the fourth hole from the bottom in the front
and the middle hole in the rear.
Front View
same level.
©2012 Overland Storage, Inc.
Installing in a Rack
Wide Gaps within
the EIA unit
Narrow Gaps
between EIA units
Rear View
4-4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents