Rack Installation - Overland Storage NEO 200S User Manual

Network storage
Hide thumbs Also See for NEO 200S:
Table of Contents

Advertisement

NEO 200s/400s User Guide
2. Remove blue securing label ( ).
3. Lift and remove the shipping lock ( ).
4. Store the shipping lock and blue label at the top right ( ) of the rear panel of the
library.
Slide the lock into the slot with the bottom of the lock showing below the slot. Press
the label over the flat part of the lock.

Rack Installation

The NEO 200s/400s libraries each come with a rack shelf kit for easy installation and
securing of the library into a 19-inch (EIA-310) rack.
IMPORTANT: Two-post telco-style or other racks less than 29 inches in depth will NOT support
this unit.
Install the Rack Rails
1. Determine the location in your rack for your library to be installed and, using a
pencil, mark the location on each vertical rail in your rack.
NOTE: A 2U library requires 2U (3.5 in.) of rack space. A 4U library requires 4U (7 in.) of rack
10400367-001 04/2012
space.
2U (3.5 in.)
©2012 Overland Storage, Inc.
Installing in a Rack
4-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents