Chapter 4
To install and configure a NEO 200s/400s library, perform the procedures in this chapter in
the order they are presented.
Topics in Installation & Configuration:
•
Choosing a Location
•
Installing in a Rack
•
Configure Library Settings
•
Configuring Your Library – Web User Interface
•
Configuring Your Library – Operator Control Panel
•
Preparing the Host
•
Verifying the Connection
•
Cartridge Magazines
•
Populating the Library with Data Cartridges
•
Inserting the Cleaning Cartridge
•
Registering for Support Notification
Choosing a Location
Choose a location that meets the following criteria:
Criteria
Room Temperature
Power Source
Air Quality
10400367-001 04/2012
Installation & Configuration
Definition
16 to 32°C (60 to 90°F)
AC Power Voltage: 100 to 240 Vac. (4.0 to 1.5 A)
NOTE:
The 4U library requires two separate power sources to
implement redundant power.
Line Frequency: 50 to 60 Hz
Place the library near an AC outlet. The AC power cord is the
product's main AC disconnect device and must be easily
accessible at all times. Two separate power sources must be
available for redundant power.
The library should be placed in an area with minimal sources of
particulate contamination. Avoid areas near frequently used
doors and walkways, stacks of supplies that collect dust, printers,
and smoke-filled rooms. Excessive dust and debris can damage
cartridges and the tape drive.
©2012 Overland Storage, Inc.
4-1