Defining A New 4X4 Configuration - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

The following is the legend used for the figures represented in this subsection.
For details on each definition procedure in this section, see the following:
Procedure for a Local Scan
For details, see
on how to operate the ISPF panels, see
Procedure for defining a path set and establishing a logical path
For details, see
ISPF panels, see
Procedure for defining the route list
For details, see
panels, see
Procedure for registering a command device
For details, see
the ISPF panels, see
Procedure for defining a copy group
For details on how to operate the ISPF panels for defining a copy group container, adding a
consistency group, and defining an EXCTG, see
attributes" (page

Defining a new 4x4 configuration

To define a new 4x4 configuration, perform the following procedure.
Setting up the Storage System
Set up the following items by using Remote Web Console.
1.
Configure an arbitration command device on the subordinate disk controller.
2.
Set up an arbitration path from the supervisor disk controller to the subordinate disk controller.
3.
Map the arbitration command device on the subordinate disk controller to the supervisor disk
controller (setup of the remote command device).
4.
Register the journal group (timer type: SYSTEM) in each of the primary site and secondary
site storage systems.
Setting up a Business Continuity Manager Environment
Scan the storage system, define a path set, establish a logical path, define a route list, and then
register a command device. For details on the procedure, see the steps immediately before the
creation of a copy group in
Creating a Copy Group
Create copy groups from the primary host.
To define a new 4x4 configuration:
1.
From the ISPF panel, define a copy group container.
194 Configuration Definitions
"Performing a local scan to acquire volume information" (page
"Establishing a logical path" (page
"Creating a path set" (page 439)
"Defining the route list" (page
"Defining a route list" (page
"Registering a command device" (page
"Registering a command device in a Storage System" (page
486),
"Adding a C/T group" (page
"Definition procedure (2DC configuration)" (page
"Local scan procedure" (page
112). For details on how to operate the
and
"Establishing a logical path" (page
118). For details on how to operate the ISPF
457).
119). For details on how to operate
"Defining the copy group ID and copy group
487), and
"Defining an EXCTG" (page
106). For details
430).
456).
470).
489).
131).

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents