Figure 13 A 3DC Multi-Target configuration example
NOTE:
While the primary site is operating normally, hosts at the local and remote sites need not
be used.

Operations during local or remote site storage system maintenance or a failure

As shown in
Figure 14 (page 45)
and
Figure 15 (page
46), during local or remote site storage
system maintenance or a failure, the configuration can be changed to a 2DC configuration without
stopping the operations at the primary site.
Figure 14 Storage system maintenance at the local site (3DC Multi-Target configuration)
Replication products and data center configurations