HP XP P9500 Software User's Manual page 366

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

YKMAKE HOLD
YKEWAIT GOTO(HOLD)
9.
Use Remote Web Console to set a Delta Resync control path required for each copy pair.
10. Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details,
1 1. Use TPC-R on the primary host to execute HyperSwaps.
The copy direction of Cnt Ac-S copy pairs with the HyperSwap attribute is reversed, and the
groups are moved from the DUPLEX status to the SWAPPING status.
12. Detect HyperSwaps of the Cnt Ac-S copy pairs with the HyperSwap attribute, and check the
status of each copy group.
13. On the primary host, execute the YKSUSPND FLUSH command for Cnt Ac-J Z copy pairs
between the local storage system and the remote storage system.
366 Maintenance and Troubleshooting Operations
"Operation Startup Procedure" (page
350).

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents