Settings For Operations On The Local Site (3Dc Multi-Target Configuration) - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

To see the procedure for loading and building a logical path, see
(page
456).
4.
From the primary host, register a command device for the storage system of the primary site,
local site, and remote site, in either of the following orders.
The primary site first, followed by the local site, and then the remote site
The primary site first, followed by the remote site, and then the local site
This creates the command device definition file.
For details on how to register a command device in a storage system, see
command device in a Storage System" (page

Settings for Operations on the Local Site (3DC Multi-Target Configuration)

To set operations on the local site:
"Establishing a logical path"
470).
Defining a 3DC Multi-Target configuration 155
"Registering a

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents