Failback - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

4.
On the primary host, execute the YKRESYNC DELTAJNL command for Cnt Ac-J Z copy pairs
that are in the HOLD status and that are between the local storage system and the remote
storage system.
YKQUERY
YKRESYNC DELTAJNL
YKEWAIT GOTO(DUPLEX)
5.
Start a failure recovery of the primary storage systems.
2DC configuration operations are performed from the local storage system.

Failback

1.
Recover the primary storage system failure.
2.
Use TPC-R on the primary host to dissolve the Cnt Ac-S copy pairs with the HyperSwap attribute.
3.
Use TPC-R on the primary host to reconfigure the paths required for Cnt Ac-S copy pairs with
the HyperSwap attribute.
364 Maintenance and Troubleshooting Operations

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents