Failback - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

5.
Start operation on the local site.
Operation in the 3DC Multi-Target configuration is performed from the local site.

Failback

To perform failback:
1.
Recover the primary site host from the failure.
2.
Stop operation on the local site.
3.
From the primary site, execute the YKSUSPND FLUSH command for the Continuous Access
Journal Z copy pair between the local site and the remote site.
YKQUERY
YKSUSPND FLUSH
YKEWAIT GOTO(SUSPEND)
4.
From the primary site, execute the YKSUSPND FORWARD command for the Continuous Access
Synchronous Z copy pair.
336 Maintenance and Troubleshooting Operations

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents