Operating Procedure During An Intermediate Site Storage System Failure (Nonvolatile) - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

7.
From the primary site, execute the YKRESYNC SELECT(COND) command for the Continuous
Access Journal Z EXCTG.
YKQUERY
YKRESYNC SELECT(COND)
YKEWAIT GOTO(DUPLEX) NOINVALIDCHECK
Operation is returned to normal.

Operating Procedure During an Intermediate Site Storage System Failure (Nonvolatile)

The preparation and recovery procedures to be performed when a nonvolatile failure occurs in
the intermediate site storage system are the same as the procedures to be performed when a path
failure occurs between the primary site storage system and the intermediate site storage system.
See
"Operating Procedure During a Path Failure between the Primary Site Storage System and the
Intermediate Site Storage System" (page
424).
Using a 4x4x4 Cascade Configuration
415

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents