YKQUERY
YKSUSPND FLUSH
YKEWAIT GOTO(SUSPEND)
1 1. On the primary host, execute the YKRESYNC DELTAJNL command for Cnt Ac-J Z copy pairs
that are in the HOLD status and that are between the primary storage system and the remote
storage system.
YKQUERY
YKRESYNC DELTAJNL
YKEWAIT GOTO(DUPLEX)
If the command is successful, the Cnt Ac-J Z copy pairs between the local storage system and
the remote storage system are automatically moved to the HOLD status.
12. Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details, see
"Operation Startup Procedure" (page
Using a 2DC configuration with HyperSwap and Continuous Access Journal Z 371
350).