Operating Procedure During A Path Failure Between The Primary Site Storage System And The Local Site Storage System - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

7.
From the primary site, execute the YKRESYNC DELTAJNL command for the delta resync pair.
YKQUERY
YKRESYNC DELTAJNL
YKEWAIT GOTO(DUPLEX)
If the command is successful, the Continuous Access Journal Z copy pair on the local site and
the remote site is automatically moved to the HOLD status (delta resync pair).
Operation is returned to normal.
NOTE:
If during operation the status of a delta resync pair changes to HOLDTRNS, NODELTA,
or HOLDER, see
Operated Successfully" (page
Operating Procedure During a Path Failure Between the Primary Site Storage System
and the Local Site Storage System
The following explains the procedures to be performed when a path failure occurs between the
primary site storage system and the local site storage system.
338 Maintenance and Troubleshooting Operations
"Actions to be Taken When the Delta Resync Function Cannot be Set Up or
340).

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents