7.
Press [On/Off] on the front panel, turn on the output.
8.
Press [Run] key in the ARB function interface.
9.
Based on the selected trigger method, perform the trigger operation.
Take the manual trigger as an example. Press [Shift]+[5](Trigger) on the
front panel to run the selected ARB file.
Programming via SCPI instructions
For detailed instructions and parameter introduction, please refer to the
instructions of "ARB Subsystem" in the Programming Guide.
Realized by the software PV6600 on PC
For detailed function usage, please refer to PV6600 User Manual.
4.5 Battery Charging/Discharging Test Function
This series power supply provides the battery charging/discharging test function
based on its unique bidirectional power supply properties. Suitable for
charging/discharging tests on all types of portable batteries.
When connecting the DUT (battery/capacitor), do not short-circuit the
battery/capacitor.
Before performing the battery test, you need to connect the Sense
cables to both ends of the battery. If the Sense cables are not
connected, the instrument cannot detect the Sense voltage and
prompt "Wait Sense Link!", which will prevent the battery test from
continuing.
Battery Charging Function
1.
Click BAT on the Menu screen to enter the battery charging/discharging
function interface.
2.
Press the up/down key to move the cursor to the Mode function setting
and press the [Enter] key to confirm. Rotate the knob to select Charge
and press the [Enter] key to confirm.
Copyright ©ITECH Electronic Co., Ltd.
Power Supply Function
53
Need help?
Do you have a question about the IT6600C Series and is the answer not in the manual?