Download Print this page

ITech IT6600C Series User Manual page 135

Bidirectional programmable dc power supply

Advertisement

IEC parameters description:
3.
Fill in corresponding parameter in the IEC file edit interface and press
[Save].
4.
Press [Esc], and return to the IEC function interface. The IEC display zone
displays the edited IEC file.
Select/Run IEC File
If several IEC files are edited, press Open to recall the IEC file to be tested.
Detailed operation steps are as below:
1.
Click IEC on the Menu screen to enter the regulation test screen.
2.
Click the [Open] key on the screen, select the saved .csv file, and click the
[Open] key to enter the file.
3.
Press [On/Off] on the front panel, turn on the output.
4.
Press [Run] key in the IEC function interface to run the IEC file.
Click [Stop] to stop the present running.
4.9 Solar Photovoltaic Curve Simulation Function (SAS)
The IT6600 series power supply provides the maximum power point tracking
(MPPT) mechanism built-in, and it is very important to test the efficiency of this
MPPT. The PV array/module/cell is a device that converts from light energy to
Test Type
Select the test type.
Vnom [V]
The rated voltage of the device under test.
To Vnom [%]
Set the test level.
Keep Time [s]
Test time.
Slew [V/ms]
Voltage change slew.
Repeat
Repeat number.
Delay [s]
Time delay, the time interval between test items.
Save
Save the IEC file.
Config
Configure the IEC file to make it effective.
Delete all of step information.
Clear all
Copyright ©ITECH Electronic Co., Ltd.
Dips: Voltage dips.
Interruptions: Short interruptions.
Variations: Voltage variations.
Power Supply Function
126

Advertisement

loading
Need help?

Need help?

Do you have a question about the IT6600C Series and is the answer not in the manual?

Subscribe to Our Youtube Channel