Mitsubishi PBV20N2 Service Manual page 55

Table of Contents

Advertisement

   
   
© Mitsubishi Forklift Trucks 2013. All
© Mitsubishi Forklift Trucks 2013. All
PBV20N2
PBV20N2
3. 3. Wet the new wheel shaft bolt
Wet the new wheel shaft bolt with
Loctite 243.
Loctite 243.
4. 4. Install the new wheel shaft bolt.
Install the new wheel shaft bolt.
5. 5. Tighten the new wheel shaft bolt.
Tighten the new wheel shaft bolt.
The correct tightening torque is
The correct tightening torque is
27 Nm.
27 Nm.
5.9.2
5.9.2
Assembly of of the
Assembly
the traction
1. 1.  Align the rim'
 Align the rim's hole pattern
s hole pattern with the
wheel shaft bolts and slide the
wheel shaft bolts and slide the
traction wheel into place.
traction wheel into place.
2. 2. Install the five rounded cone nuts
Install the five rounded cone nuts
and tighten them. The correct
and tighten them. The correct
tightening torque for the nuts is
tightening torque for the nuts is
80 Nm.
80 Nm.
rights
rights reserved.
reserved. 
 
Revision: B 
Revision: B
https://www.forkliftpdfmanuals.com/
with
traction wheel
wheel
with the
 
Document ID: 615023
Document ID: 615023
Service Manual
Service
Manual
55 (244) 
55 (244)
 

Advertisement

Table of Contents
loading

Table of Contents