Mitsubishi PBV20N2 Service Manual page 192

Table of Contents

Advertisement

© Mitsubishi Forklift Trucks 2013. All
© Mitsubishi Forklift Trucks 2013. All
   
   
rights reserved.
rights
reserved. 
 
Revision: B
Revision: B 
PBV20N2
PBV20N2
4. 4. Remove the lever connector.
Remove the lever connector.
5. 5. Remove the two screws from the
Remove the two screws from the
mounting bracket.
mounting bracket.
6. 6. Remove the controller.
Remove the controller.
7. 7. Remove the mounting bracket.
Remove the mounting bracket.
15.4.2
15.4.2
Installing the
Installing
the controller
1. 1. Connect the lever wires to the
Connect the lever wires to the connector. The pin locations from 1 to
marked on the connector with lines and help you in determining the rest of the pin
marked on the connector with lines and help you in determining the rest of the pin
locations. Details of the controller wires and their
locations. Details of the controller wires and their pin locations are available in
Figure 94
Figure 94 and
and Table 11
 Table 11 below.
2. 2. Install the controller and tighten the screws.
Install the controller and tighten the screws.
3. 3. Connect the controller
Connect the controller connector.
4. 4. Install the levers.
Install the levers.
5. 5. Tighten the screws at the end of the levers.
Tighten the screws at the end of the levers.
6. 6. Calibrate the controller. For instructions, see
Calibrate the controller. For instructions, see section
Figure 94. Controller for lifting and lowering pin locations
Figure 94. Controller for lifting and lowering pin locations
https://www.forkliftpdfmanuals.com/
 
Document ID: 615023
Document ID: 615023
controller for
for lifting
lifting and
and lowering
connector. The pin locations from 1 to 3 are
below.
connector.
Service Manual
Service
Manual
lowering
3 are
pin locations are available in
section 9.1.
 9.1.   
191 (244) 
191 (244)
 