Initial Startup - Profimess SW-08 Operating Instructions Manual

Varible area flowswitch
Table of Contents

Advertisement

Installation and initial startup

Initial startup

5.5 Initial startup
The following steps must be carried out
before initial startup and any subse-
quent startup (e.g. after removal and
installation during maintenance).
1.
WARNING!
Make sure that the plant is
operating vibration-free.
Vibrations could destroy the
device. This could result in a
serious risk of injury to the
user.
2.
WARNING!
Make sure that the medium
is flowing continuously.
Pulse-like staggered loads
could destroy the device.
This could result in a serious
risk of injury to the user.
3.
NOTICE!
Completely fill the pipe lines.
Partial filling(s) may result in
malfunctions and damage to
the device.
34
4.
NOTICE!
Vent the pipe line. If there
are air bubbles in the line
during the measurement
then this could result in
damage to the device
caused by hydraulic shock.
This could result in malfunc-
tions.
5.
NOTICE!
Make sure that the plant is
operating without cavitation.
Cavitation may result in mal-
functions and damage to the
device.
20.02.2015

Advertisement

Table of Contents
loading

Table of Contents