Profimess SW-08 Operating Instructions Manual page 312

Varible area flowswitch
Table of Contents

Advertisement

Maintenance
Maintenance > Switch contact replacement
Fig. 74: Remove switch contact from
guide rails
Remove the switch contact from
4.
the guide rails by sliding the
switch contact in the direction of
the arrow (Fig. 74).
72
Fig. 75: Remove switch contact
Remove switch contact from the
5.
device
6.
Position the new switch contact
Slide the switch contact between
7.
the guide rails
Connect a continuity meter: For
8.
Normally Open Contact (NOC),
pin 1 and pin 2 are assigned; for
Change Over Contact (COC),
pin 1 and pin 3 are assigned.
9.
Slide the switch contact against
the flow direction until it stops.
The switch contact must now be
closed.
23.02.2015

Advertisement

Table of Contents
loading

Table of Contents