Fig. 13: Screw in the device
Keep turning in the adapter
3.
union (Fig. 13/1) while holding
the process connection of the
device locked (Fig. 13/2) until
the connection is tight.
Repeat these steps at the other
4.
end of the device.
23.02.2015
Installation and initial startup
5.5 Initial startup
The following steps must be carried out
before initial startup and any subse-
quent startup (e.g. after removal and
installation during maintenance).
1.
WARNING!
Make sure that the plant is
operating vibration-free.
Vibrations could destroy the
device. This could result in a
serious risk of injury to the
user.
2.
WARNING!
Make sure that the medium
is flowing continuously.
Pulse-like staggered loads
could destroy the device.
This could result in a serious
risk of injury to the user.
3.
NOTICE!
Completely fill the pipe lines.
Partial filling(s) may result in
malfunctions and damage to
the device.
Initial startup
35