Profimess SW-08 Operating Instructions Manual page 105

Varible area flowswitch
Table of Contents

Advertisement

Installation and initial startup
Preparatory work
Installation position/direction of flow
Fig. 6: Installation position/direction of flow
Only install the flow monitor in one of the positions displayed in the drawing. The
medium must flow in the direction of the arrow (from a low to a high scale value).
28
23.02.2015

Advertisement

Table of Contents
loading

Table of Contents