Measures To Be Taken After Maintenance Work - Profimess SW-08 Operating Instructions Manual

Varible area flowswitch
Table of Contents

Advertisement

Connect a continuity meter. For
7.
Normally Open Contact (NOC),
connect PIN 1 and PIN 2. For
Change-Over Contact (COC),
connect PIN 1 and PIN 3.
8.
Slide the switch contact in the
opposite direction of flow up to
the stop. The switch contact
must now be closed.
Slowly slide the switch contact in
9.
the direction of flow until the
contact opens. This switch point
should be set as accurately as
possible because it affects the
accuracy of the switchpoint
adjustment scale values (If nec-
essary, repeat steps 9 and 10).
10.
Tighten the set screw (Fig. 64/1)
observing the proper torque
(
Ä
Chapter 11.1 "Tightening
torque" on page 78)
Bond the enclosed rating plate
11.
with the setting arrow onto the
switch contact so that the setting
arrow is in alignment with the
lowest scale mark. If a reference
mark is present on the scale,
(recognizable due to a thinner
line width), then this is to be
used as the reference mark. The
bonding surface must be dry and
free of grease.
Set the desired flow rate (cut-off
12.
point) using the scale on the
device body.
13.
Position the female socket and
gasket, then tighten the fixing
screw.
23.02.2015

Measures to be taken after maintenance work

8.6 Measures to be
taken after mainte-
nance work
Take the following steps after comple-
tion of maintenance work and before
switching on the device:
Check all previously loosened/
1.
released screw connections for
tightness.
2.
Clean the work area and remove
all residual materials, packaging,
substances or spills.
Maintenance
69