Profimess SW-08 Operating Instructions Manual page 305

Varible area flowswitch
Table of Contents

Advertisement

Fig. 58: Tighten process connection
(inlet)
Using a proper sized fixed
7.
spanner tighten the process con-
nection (inlet). Hold the device
body in place using a suitable
fixed spanner (Fig. 58), and
observe the proper torque
(
Ä
Chapter 11.1 "Tightening
torque of screws" on page 85)
23.02.2015
Fig. 59: Inner parts
Insert spring (Fig. 59/1) with
8.
magnets (Fig. 59/2) into the float
(Fig. 59/3) ensuring proper mag-
netic pole orientation (north pole
toward device outlet)
Maintenance
Maintenance > Assembly
65

Advertisement

Table of Contents
loading

Table of Contents