Installation and initial startup and Operation
Preparatory work
Fig. 6: Unimpeded flow sections
1
10x DN
2
5x DN
There must be an unimpeded flow
n
section of 10xDN (rated width)
before the device.
n
There must be an unimpeded flow
section of 5xDN (rated width) after
the device.
28
Unimpeded outlet
Fig. 7: Unimpeded outlet
If the pipe system ends at an unim-
peded outlet, the flow monitor must not
be installed directly in front of the
opening. The device must always be
completely filled with media to ensure
measuring accuracy.