Section 10-4 System Maintenance; Preliminary Checks - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Section 10-4
System maintenance
10-4-1

Preliminary checks

The preliminary checks take about 15 minutes to perform. Refer to the Ultrasound system user
documentation whenever necessary.
Table 10-3
Step
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
. 2
EV
System preliminary checks
Item
Ask the customer if they have any problems or questions about the equipment.
Ask and Listen
Fill in the top of the EQC inspection form. Record all probes and Ultrasound system options.
Paperwork
• Turn the Ultrasound system power on and verify that all fans and peripherals turn on.
• Watch the displays during power up to verify that no warning or error messages are displayed.
Power up
• Where applicable, confirm that the battery is charged. If no AC Input present, use the internal
battery.
Verify that the Ultrasound system properly recognizes all probes.
Probes
Verify proper display on the monitor and touch panel (where present).
Displays
Where applicable, for Warranty and Contract Customers only:
InSite
• Verify that InSite is functioning properly.
• Ensure two-way remote communications.
Review
Where applicable, Error Logs can be reviewed via system diagnostics.
Error Logs
Optional.
Diagnostics
Presets
Backup all Customer Presets to an appropriate media.
Image Archive
Back up the Image Archive onto appropriate media.
Chapter 10 Care & Maintenance
LOGIQ E9 S
Description
M
ERVICE
ANUAL
10 - 7

Advertisement

Table of Contents
loading

Table of Contents