Figure 5-3: Preparing The Rear Panel Holes; Figure 5-4: Tools Required For Cabinet Installation - Eci Telecom NPT-1020 Installation And Maintenance Manual

Table of Contents

Advertisement

NPT-1020 Installation and Maintenance Manual
2.
Place the enclosed drilling template on the prescribed position; align it at the desired height using a
bubble level and secure it to the wall.
3.
Drill four holes using the four upper holes in the template (the cabinet is 6U high).
N
OTE: Use a drill of max. 8 mm.
D
ANGER: The operator is responsible for the secure mounting of the cabinet to the wall,
using appropriate installation materials.
The tools illustrated in the following figure are required for the installation (not supplied with the cabinet).
ECI Telecom Ltd. Proprietary

Figure 5-3: Preparing the rear panel holes

Figure 5-4: Tools required for cabinet installation

NPT-1020 Wall-Mounted Installations
5-4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents