NPT-1020 Installation and Maintenance Manual

5.7.2 Installing the NPT-1020 Platform

The NPT-1020 platform is installed at the bottom of the cabinet.
To install the NPT-1020 platform:
1.
Identify the prescribed position of the NPT-1020 in the cabinet according to the figure in the topic
Installing the NPT-1020 and Three
2.
Place the NPT-1020 platform in the prescribed position using the two stabilizing pins to hold it
temporarily in place.
3.
Fasten the platform to the vertical extrusion with four M6 screws and flat washers.

5.7.3 Installing the DDFs

The DDFs are installed above the NPT-1020 in the cabinet.
To install the DDFs:
1.
Identify the prescribed position of the DDF in the cabinet according to the figure in the topic
the NPT-1020 and Three
2.
Place the DDF in the prescribed position, and then fasten it to the vertical extrusions with four M6
screws and flat washers.
3.
Repeat Steps 1 and 2 for the other two DDFs.
5.8
Installing the NPT-1020, Two DDFs, and an AC
CONV Unit
In this configuration, the NPT-1020, two DDFs, and an AC CONV unit are installed in the cabinet. Installation
includes the following steps:
1.
Installing clip nuts
2.
Installing the NPT-1020
3.
Installing two DDFs
4.
Installing the AC CONV unit
ECI Telecom Ltd. Proprietary
DDFs.
DDFs.
NPT-1020 Wall-Mounted Installations
Installing
5-16