First Power-Up; Basic Commissioning Of The System Software - Siemens SINUMERIK 840Di sl Commissioning Manual

Hide thumbs Also See for SINUMERIK 840Di sl:
Table of Contents

Advertisement

Power-On and Power-Up

5.2 First power-up

5.2
First power-up
5.2.1

Basic commissioning of the system software

Objective of basic commissioning
After the basic commissioning described in the following two sections, the following
conditions should apply:
● SINUMERIK 840Di sl NC and PLC are operated in cyclical operation
● If a machine control panel is connected, no alarms or messages should be pending.
● The displayed axes of the NC can be traversed by simulation.
Factory settings
The hard disk of the PCU is already partitioned upon delivery for operating the SINUMERIK
840Di sl. Additional software applications, which have been been ordered, e.g. HMI
Advanced, are ready for installation under:
● D:\Setup\Apps\<
Figure 5-1
Installing the software
When the PCU is first booted, the following menu is displayed:
124
Application1
> . . . <
Partitioning the hard disk
Application n
>
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 840die sl control

Table of Contents