Load configuration in PG (PLC -> STEP 7)
The configuration of a SINUMERIK 840Di sl PLC must be loaded onto an external computer
(STEP 7 PG/PC) using an Ethernet connection.
Requirements
The following conditions must be fulfilled:
● The computer can communicate via Ethernet or an Ethernet connection has been
● The PG/PC is connected to the Ethernet interface 1 (Company Network) of the
● The IP address of the Ethernet interface 1 (company network) of the SINUMERIK 840Di
Implementation
Perform the following steps to load the configuration from the target system:
1. Start STEP 7 on the external computer (PG/PC).
2. Create a new STEP 7 project to which the configuration shall be loaded.
3. Select in STEP 7 for the project via the menu bar Target system > Load station in PG.
Dialog
Dialog: "Select node address"
OK
After entering all relevant data, press OK to confirm the dialog.
The configuration is now uploaded from the controller into the project.
Manual
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
established
SINUMERIK 840Di sl PCU. (See Subsection "Ethernet connections of the PCU
50.3" (Page 187))
sl PCU is known. (See Subsection "Determine Ethernet communication parameters of the
PCU" (Page 188))
Since the communication parameters have not yet been communicated to STEP 7, the
node address selection dialog is displayed. Enter the following data:
Rack:
Slot:
Target station:
IP Address:
6.8 Load configuration in PG (PLC -> STEP 7)
0
2
Local
<IP-Adr. of the Ethernet-SST 1 of the PCU>
Note:
Press the "Return" key to confirm the entry of the IP address